Auric hails strong drilling results ahead of Munda gold restart
Auric said 92 grade control holes and a 4m hit at 10.49 g/t gold support resource growth and a planned mine restart in 2027.
5 Articles
5 Articles
Auric hits high-grade gold beyond WA Munda pit shell
Auric Mining has hit 4m at 10.49g/t gold in drilling west of its planned WA Munda pit, alongside grade control drilling, which jagged15m at 5.56g/t gold near surface.
Auric hails strong drilling results ahead of Munda gold restart
Image: Olga/stock.adobe.comAuric Mining has reported further strong drilling results at its Munda gold project in Western Australia as it advances the project towards a planned restart of mining in 2027. The company’s ongoing drilling programs are targeting potential resource extensions, grade control within the planned open pit and sterilisation drilling for future infrastructure areas. Broad-spaced reverse […] Australian Mining.
Coverage Details
Bias Distribution
- 60% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium






