institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

ASUS Announces Advanced AI POD Design Built with NVIDIA at Computex 2025

  • ASUS announced at Computex 2025 an advanced AI POD design accelerated by NVIDIA for enterprise IT applications worldwide.
  • This announcement follows ongoing efforts to deliver faster AI factory deployments with reduced risks using NVIDIA GB200/GB300 racks and advanced networking.
  • The AI POD utilizes liquid cooling to support a fully connected cluster of 576 GPUs distributed over eight racks, along with an alternative air-cooled configuration that accommodates 72 GPUs per rack.
  • The system integrates NVIDIA MGX-compliant ESC8000 servers with dual Intel Xeon processors, RTX PRO 6000 Blackwell GPUs, and ConnectX-8 SuperNIC delivering up to 800Gb/s speeds.
  • This centralized rack solution provides scalable, high-performance infrastructure that accelerates agentic AI adoption with improved efficiency, reduced TCO, and worldwide support.
Insights by Ground AI
Does this summary seem wrong?

70 Articles

All
Left
7
Center
21
Right
6
The Times of Northwest IndianaThe Times of Northwest Indiana
+67 Reposted by 67 other sources
Center

ASUS Announces Advanced AI POD Design Built with NVIDIA at Computex 2025

Enterprise-optimized reference architectures for accelerated AI infrastructure solutions

·Cherokee County, United States
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 62% of the sources are Center
62% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Charleston Gazette-Mail broke the news in Charleston, United States on Tuesday, May 20, 2025.
Sources are mostly out of (0)