Published • loading... • Updated
Alliant Energy adds 100-MW BESS next to 200-MW Wisconsin solar project
Summary by Solar Power World
1 Articles
1 Articles
Alliant Energy adds 100-MW BESS next to 200-MW Wisconsin solar project
Alliant Energy announced the successful integration of its first 100-MW Battery Energy Storage System (BESS). Placed next to the company’s 200-MW solar project in Grant County, the newly operational battery captures and stores excess energy generated by solar and other resources, then releases the energy to the grid as needed. “Energy storage systems, like this… The post Alliant Energy adds 100-MW BESS next to 200-MW Wisconsin solar project appe…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium