The Panama Metro reported that the Albrook station will start operations at 9:00 a.m. this Sunday due to installation work on a new structure that will be part of the connection between lines 1 and 3.
The Panama Metro reported that the Albrook station will start operations at 9:00 a.m. this Sunday due to installation work on a new structure that will be part of the connection between lines 1 and 3.