Akw Gösgen Stands Still Longer: Authority Wants Safety Proof
Summary by Beobachter
1 Articles
1 Articles
The Gösgen nuclear power plant has to extend the revision by about three weeks, because the supervisory authority demands a safety certificate. This can be expensive for the shareholders of the plant.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium