Published • loading... • Updated
Great Barrington Selectboard Approves Plan to Repair Sinkhole on Division Street Bridge
Summary by The Berkshire Edge
2 Articles
2 Articles
Great Barrington Selectboard approves plan to repair sinkhole on Division Street bridge
Great Barrington — At a meeting held on Zoom on Tuesday, April 14, the Selectboard approved a plan to repair the sinkhole on the Division Street bridge. The bridge has been closed to traffic since March 20, when the sinkhole was discovered on the east side of the temporary bridge abutment. The bridge was closed to traffic for two years starting in 2020 after a 2018 inspection by the state’s Department of Transportation deemed the bridge “structu…
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center2Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium

