Roadblocks Lifted After Muren, Bundesheer Deployment in Gschnitz Ends
2 Articles
2 Articles
After several Muren exits this week in Tyrol, the temporarily closed state roads can be reopened for traffic. Clean-up work in Gschnitz is progressing, but the repair of the creek bed will take months.
L 232 Ranalter Straße in an on-time traffic passableL 68 Stanzertalstraße two-lane with speed limit passableAfter intensive cleaning and repair work, the temporarily blocked state roads in Tyrol can be re-opened for traffic this week: The L 10 Gschnitztalstraße is re-opened for all traffic in the municipal area of Gschnitz from today, Friday evening, 7 pm. The L 232 Ranalter Straße in the municipality area of Neustift in the Stubaital (local are…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium