Afcons - Sam JV Records Agra Metro's Final Tunnel Breakthrough
Summary by The Metro Rail Guy
1 Articles
1 Articles
All
Left
Center
Right
Afcons - Sam JV Records Agra Metro's Final Tunnel Breakthrough
Afcons Infrastructure – Sam India Consortium last Tuesday celebrated tunnel boring machine (TBM) 324’s final breakthrough at Mankameshwar Mandir Station for Agra Metro Phase 1 project‘s 14.25 km Line-1 (Sikandra – Taj East Gate). Nicknamed TBM Ganga, this was 324’s fifth tunnel breakthrough and overall the 18th and final breakthrough for Agra Metro’s 7.93 km underground Package […] The post Afcons – Sam JV Records Agra Metro’s Final Tunnel Break…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium