CBRE Negotiates 120,000 SF Office Headquarters Lease in Gaithersburg, Maryland for X-Energy
3 Articles
3 Articles
Round Up: TVA chief nuclear officer resigning; Last Energy moves forward in UK; Fermi America, Hyundai E&C signs MOU; X-Energy purchases new testing facility - ExchangeMonitor
(Page 1) Chief Nuclear Officer Tim Rausch has announced his resignation from Tennessee Valley Authority, effective by March 1, 2026, according to a July 14
CBRE Negotiates 120,000 SF Office Headquarters Lease in Gaithersburg, Maryland for X-Energy
GAITHERSBURG, MD. — CBRE has negotiated a 120,000-square-foot office lease in Gaithersburg for American nuclear reactor and fuel design engineering company X-Energy. The new office will span the top five floors of Waterfront at Washingtonian, a 325,455-square-foot office property located at 9801 Washingtonian Blvd., about 20 miles northwest of Washington, D.C. Waterfront at Washingtonian is a 14-story, LEED-certified office building situated wit…
Advance Nuclear Energy X-Energy Bets Big on Maryland Amid Concerns About Small Modular Reactors
Advanced-reactor developer X-energy will move its headquarters to Gaithersburg and open a new test-and-training center in Frederick, promising 525 new jobs and cementing Maryland’s bid to lead the next wave of clean-energy manufacturing. However, skepticism around small modular reactor (SMR) economics, waste output, and licensing timelines has drawn sharp criticism from analysts and environmental groups. The Rockville-based company will consolid…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium