Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published • loading... • Updated

Works on the Besòs River to Repair Damage and Remove Debris From the Flood Will Last Weeks

Summary by El Periódico
The works to repair the damage caused by the historical flood of the Besòs River on October 4 and to remove the rubble that the force of the water pushed to the lower part of the river began on Monday and will lengthen a few days. The accumulation of broken canes and torn trunks that mix with other wastes that remain in the final stretch of the river, where the river park extends between Santa Coloma de Gramenet and Sant Adrià, will force some t…

6 Articles

Center

The works to repair the damage caused by the historical flood of the Besòs River on October 4 and to remove the rubble that the force of the water pushed to the lower part of the river began on Monday and will lengthen a few days. The accumulation of broken canes and torn trunks that mix with other wastes that remain in the final stretch of the river, where the river park extends between Santa Coloma de Gramenet and Sant Adrià, will force some t…

·Barcelona, Spain
Read Full Article
Lean Left

The Catalan Agència de l'Aigua (ACA) and Adif work these days in the repair and cleaning of the railway infrastructure affected by the rainy season of the weekend of October 3-4. The operators focus on the final stretch of the Besòs -with the bridge of Cercanías de Sant Adrià de Besòs- but also on the river Ridaura, in the Baix Empordà, and in different points of the Vallès Oriental and Occidental. Continue reading...

·Barcelona, Spain
Read Full Article
Lean Right

In total, 29 working groups have been mobilized, with 110 workers and 71 machinery and vehicle units.More information: Reopen the Besòs river park after the rainy season: which areas can be visited

·Spain
Read Full Article

ACA and Adif work on the riverbed and the Rodalies bridge in the final stretch of the Besòs, among other places in València

Read Full Article

(ACN) Adif and the Catalan Water Agency of the Generalitat are working these days on the repair and cleaning of the channel and the Rodalies bridge of the Besòs river, affected by the rain storm of October 3 and 4. In addition to this infrastructure in Sant Adrià de Besòs, the operators are also working at different points […]

Read Full Article

Adif mobilizes 29 brigades and 110 operators and disburses 250,000 euros to restore Rodalies after six days of cuts.The entrance Six days of cuts in Rodalies: Adif invests 250,000 euros to repair the roads aparece primero en Merca2.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 34% of the sources lean Left, 33% of the sources are Center, 33% of the sources lean Right
34% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

EL ESPAÑOL broke the news in Spain on Monday, October 12, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal