Skip to main content
See every side of every news story
Published loading...Updated

Train Accident in Cordoba, Live Adif Does Not Rule Out a Factory Defect and Will Check the Whole Lot of Lanes Like the One that Broke in Adamuz

Summary by 20minutos
On Friday, the committee of inquiry into the Adamuz accident published a report that attributed the accident to the breaking of the lane prior to the passage of the Iryo, which ended up giving way before the passage of the car that derailed, without specifying what caused that break. Faced with the possibility, still hypothetical, that the rail could have a factory failure, the Minister of Transport, Oscar Puente, has asked Adif to check all the…

23 Articles

Lean Right

On January 7, there was an "inspection of detours", but the last ultrasound auscultation was on November 10th and the last dynamic on November 21st. In the midst of the crisis the 'Séneca', star auscultator train of Adif, was this Friday broken, separated in a workshop. Other equipment acquired for the same thing have been unapproved and vandalized months. The situation causes amazement in the field Read

·Madrid, Spain
Read Full Article
Diario de CádizDiario de Cádiz
+7 Reposted by 7 other sources
Center

The steel company offers its collaboration following Adif's hypotheses about a possible factory defect in the accident lane The investigation points to the breakage of the track as the main hypothesis of the Adamuz accident Everything is known about the accident.

Lean Right

An internal part of 35 pages reflects the worrying situation of the Spanish railway network.

Lean Left

The finding of a possible factory defect in the broken rail in Adamuz (Córdoba), and that last Sunday may have been the cause of the serious accident in which 45 people died, already motivates the revision of the steel used in the remodeling of the stretch, concluded in May 2025. “In more than 30 years [of the high speed system], there has never been a circumstance of these characteristics and consequences. My message to the travelers is of tran…

·Spain
Read Full Article
Center

The railway infrastructure manager, Adif, does not rule out lane factory defect and will review the lots of that Adamuz track.

Lean Left

Adif points out that the supplier of the rail is ArcelorMittal and that it is Spanish steel. He has also announced a special auscultation of the material that will be made in the next few daysThe first report of the Adamuz accident points to a previous break of the road as a cause of the derailment of the Iryo The Minister of Transport and Sustainable Mobility, Oscar Puente, said this Friday that a “possible defect of factory of the lane” of the…

·Spain
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 43% of the sources are Center
43% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

20minutos broke the news in Madrid, Spain on Friday, January 23, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal