530 metres of pipes have been renewed at the equipment outlet. A second phase of work is planned in autumn on this collector which discharges the wastewater and treated
530 metres of pipes have been renewed at the equipment outlet. A second phase of work is planned in autumn on this collector which discharges the wastewater and treated