50% Capacity Boost: Aris Mining's New Segovia Mill Drives Gold Production to 42.8K Ounces in 2 Months
Summary by stocktitan.net
1 Articles
1 Articles
50% Capacity Boost: Aris Mining's New Segovia Mill Drives Gold Production to 42.8K Ounces in 2 Months
Aris Mining's second Segovia mill ramps up to 2,415 tpd avg throughput, hitting 3,000 tpd design capacity. YTD gold production reaches 161K oz with 10.02 g/t grades. On track for 230-275K oz 2025 guidance.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium