Perth-headquartered renewable energy developer BLT Energy has been granted development approval for its Red Gully 800 MW / 4,800 MWh battery energy storage system (BESS). To be located adjacent to state-owned utility Western Power’s Regans Terminal, Red Gully is described as the largest utility-scale BESS proposed in WA, with phase 1 delivering up to 400 MW of power with 2,400 MWh of storage to the South West Interconnected System (SWIS). Other …
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.