Skip to main content
institutional access

You are connecting from
Lake Geneva Public Library,
please login or register to take advantage of your institution's Ground News Plan.

Published loading...Updated

2 trapped workers rescued alive from a tunnel in Nepal, officials say

The first rescues in the project came after rescuers heard voices from inside the tunnel and dug through 50 to 60 metres of debris, officials said.

  • Emergency response crews successfully rescued two workers alive from a flooded tunnel at the Upper Trishuli 3A hydropower project in central Nepal.
  • The rescue operations took place nine days after severe glacio-hydrological flooding struck the Trishuli River basin on August 26, trapping hundreds of staff in underground facilities.
  • Rescuers extracted the individuals from a depth of approximately 170 meters following continuous excavator work to clear thick mud and heavy debris blocking the primary access shafts.
  • Medical personnel at the site immediately provided emergency care to both survivors before transferring them to medical facilities for further observation.
  • Defense officials report that specialized search teams are continuing efforts in surrounding tunnels where hundreds of missing workers remain unaccounted for.
Insights by Ground AI

510 Articles

Lean Left

Locked after the devastating landslides and floods that have overwhelmed the country. One of them is in critical condition. Meanwhile the balance of the victims increases: at least 1,287 people have lost their lives, 5.083 are still missing

·Rome, Italy
Read Full Article
Lean Left

Rescue workers have saved two surviving men from a mud-buried tunnel at a hydroelectric power plant in Nepal. This is reported by international…

·Amsterdam, Netherlands (Kingdom of the)
Read Full Article
Center

Nine days after the storm that kept them, two workers were safely removed from a tunnel in northern Nepal, according to the Government

·Paço de Arcos, Portugal
Read Full Article
Lean Right

Miracle after 9 days in Nepal. Two workers were saved who were trapped in a tunnel following devastating floods. 557 workers are still missing after being stuck in tunnels, and rescue teams are trying to reach them in the hope that they are still survivors. Miracle article following apocalyptic floods in Nepal. Rescued workers after nine days underground first appear on Romania TV.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 44% of the sources are Center
44% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Nepal Press : Facts First, Truth Foremost – Online News Portal from Nepal in Nepali Language broke the news on Thursday, September 3, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal