105 Million Euros for Dimitrie Pompeiu Boulevard. Lines 16 and 36 Connected to Line 5, Plus Park&ride Parking at Pipera Metro Station
3 Articles
3 Articles
The interim mayor of the capital, Stelian Bujduveanu, announces that the feasibility study for the reconfiguration of the Dimitrie Pompeiu – Glucose Factory – Pipera Road area has been completed. The project will reach the General Council for debate. The approval will allow the local authority to launch the procurement for design and execution as soon as possible, Bujduveanu wrote on Facebook. […] The post Investment of 105 million euros to unbl…
Project of one hundred million euros for Dimitrie Pompeiu: how an important art will be transformed from Bucharest.
The City Hall of the Capital announced today the start of an essential investment to streamline traffic in one of the most congested areas of the city: Dimitrie Pompeiu – Glucose Factory – Pipera Road. The project, valued at 534.9 million lei (over 105 million euros), will be completed in approximately three years and promises to radically transform the urban infrastructure in […]
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium